ASA What do you have in mind for down-time winter projects for you business?

Bob Foster 1

Industry Mogul
January and February are slow months up here so I want to take the time to take care of a few things.

Section (widen) my vacuum hose reel
Install a 110v internal plug-in system for my box
Replace exterior lighting on box and add a better back up light
Replace a ratty old painted front bumper for a new chrome one
Organize the shop
Maybe build a tile cleaning website
 

Peter Breen

Active Member
Jan 5, 2009
519
70
28
Saint Albans Vermont
Real Name
Peter Breen
Clean out an organize shop.Finish building a cedar closet in bed rm.Install a new overhead door to garage an opener for wife.Start rebuilding my first tm a power-pak.Hopefully i won"t have time for most of my to do lists because the phone won"t stop ringing.
 

Ryan

User
Dec 11, 2009
755
1
0
Real Name
Ryan Jackson
Business Location
United States
VCT annually strip and refinish a takes up most of January for me and I plan to beat down some doors for commercial work in a couple towns over.
 

Gymee

Banned
Apr 4, 2007
4,373
11
0
Mn
Real Name
Jesus
Business Location
United States
I was planning to get a job selling high end women's shoes.
 
M

mishi

Hi there,

Spreading the earning possibilities...If anyone wants to earn more with the less efforts then please go with the carpet cleaning franchise. It is a very good option for earning as it is a need of everyone who is having a carpet in the house. So in this way you can gain a high scale of costumers.
 

JStafford

TMF Hard Surface Specialist
Mar 18, 2009
1,178
6
0
TN
Real Name
Joe Stafford
Business Location
United States
I am planning on stripping my "rush job" of a van from last year and rhino-lining the floor and walls. We'll see though...
 
Mar 7, 2006
699
3
0
georgia
Real Name
scott rogers
Just ordered a new Mytee waste tank for WOC (Thanks) It will require moving my machine over 4 inches as well as my hose reel and relocating my propane boiler from behind my hose reel to behind my machine. while I have everything out I will clean everything real good and top coat the old roll on bedliner. repair or replace any thing that turns up while in the process.