Register

If you already have an account with us, please use the login panel below to access your account.

-

1 Visitor Messages

  1. View Conversation
    I ended up buying a e-tes 120 from Interlink and tenting the underneath crawlspace and letting the e-tes along with a ducted in Phoenix 200HT heat and dehumidify the underneath. Once I dried the three layers I moved the e-tes upstairs where for the last four days I had been tenting the hardwood and ducting in dehumidified air with 2 (200ht's) on either side of the tent. I ducted e-tes onto hardwood in two seperate places in five days and once floor dried to correct MC content I was done. Took 9 days but got everything dried.
Showing Visitor Messages 1 to 1 of 1
About john mathis

Basic Information

About john mathis
Real Name:
john mathis
State:
Birmingham , al.
Equipment:
dri eaz
Which Magazines Are You Subscribed To?:
Clean fax

Statistics


Total Posts
Total Posts
93
Posts Per Day
0.13
Visitor Messages
Total Messages
1
Most Recent Message
05-16-2010 03:30 PM
Downloads
Downloads
1
Uploads
0
General Information
Last Activity
02-06-2012 11:06 PM
Join Date
02-03-2010
Referrals
0

02-16-2011


02-13-2011


02-10-2011


01-24-2011


12-27-2010


12-02-2010


11-15-2010


10-12-2010


09-30-2010


09-09-2010


08-23-2010


08-07-2010


07-28-2010


05-25-2010


No results to display...
No results to display...
No results to display...
iReviews Powered by vBcover